# OMalley-Duct-Design
1. Timeline is to start demo early April if all goes as planned
1. ERV vs. Ventilating Dehumidifier options
1. Possibly both
1. Ok to place system near / under current laundry chute which will be a duct chase for second
floor.
1. May be able to hit 3rd floor Den area from 2nd floor. The 3rd floor bedroom is going to be a
challenge due to how the joists are layed out but not much of a concern.
1. Perhaps no duct to 1st floor bathroom.
1. Move duct in kitchen near door
1. Move duct in foyer near door.
1. New central return