# OMalley-Duct-Design 1. Timeline is to start demo early April if all goes as planned 1. ERV vs. Ventilating Dehumidifier options 1. Possibly both 1. Ok to place system near / under current laundry chute which will be a duct chase for second floor. 1. May be able to hit 3rd floor Den area from 2nd floor. The 3rd floor bedroom is going to be a challenge due to how the joists are layed out but not much of a concern. 1. Perhaps no duct to 1st floor bathroom. 1. Move duct in kitchen near door 1. Move duct in foyer near door. 1. New central return