  1. Timeline is to start demo early April if all goes as planned
  2. ERV vs. Ventilating Dehumidifier options
    1. Possibly both
  3. Ok to place system near / under current laundry chute which will be a duct chase for second floor.
  4. May be able to hit 3rd floor Den area from 2nd floor. The 3rd floor bedroom is going to be a challenge due to how the joists are layed out but not much of a concern.
  5. Perhaps no duct to 1st floor bathroom.
  6. Move duct in kitchen near door
  7. Move duct in foyer near door.
  8. New central return