diff --git a/20260102180010.OMalley-Duct-Design.md b/20260102180010.OMalley-Duct-Design.md new file mode 100644 index 0000000..7866e5c --- /dev/null +++ b/20260102180010.OMalley-Duct-Design.md @@ -0,0 +1,13 @@ +# OMalley-Duct-Design + +1. Timeline is to start demo early April if all goes as planned +1. ERV vs. Ventilating Dehumidifier options + 1. Possibly both +1. Ok to place system near / under current laundry chute which will be a duct chase for second + floor. +1. May be able to hit 3rd floor Den area from 2nd floor. The 3rd floor bedroom is going to be a + challenge due to how the joists are layed out but not much of a concern. +1. Perhaps no duct to 1st floor bathroom. +1. Move duct in kitchen near door +1. Move duct in foyer near door. +1. New central return